Main | About | Tutorial | FAQ | Links | Wiki | Forum | World News | World Map | World Ranking | Nations | Electoral Calendar | Party Organizations | Treaties |
Login | Register |
Game Time: September 5474
Next month in: 03:57:09
Server time: 00:02:50, April 25, 2024 CET
Currently online (1): VojmatDun | Record: 63 on 23:13:00, July 26, 2019 CET

We are working on a brand new version of the game! If you want to stay informed, read our blog and register for our mailing list.

Bill: Army Contract of 2831

Details

Submitted by[?]: The Liberal Party

Status[?]: passed

Votes: This bill is a resolution. It requires more yes votes than no votes. This bill will not pass any sooner than the deadline.

Voting deadline: September 2831

Description[?]:

The following contracts will be given to a private defense industry to build the following Army weapons:


I) 4,000 Stryker Armored Vehicle (2,000 to be built within 5-9 years, the rest within 10 years)
II) 2,000 Bradley Fighting Vehicle (1,000 to be built within 10 years, the rest within the next 10 years)
III) 3,000 M1A1 Abrams Tank (1,000 to be built within the next 10 years, 1000 within the next 10 years, and the last 1,000 within the next 10 years)
IV) 100,000 Body Ventilation Systems (all to be built within 10 years)
V) 150 Crusher Vehicles (to be built within 10 years)
VI) 10,000 Battlefield Kitchens ( to be built within 10 years)
VII) 4,000 Barrett Sniper Rifles (to be built within 5-9 years)
VIII) 8,500 Raven UAV
IX) 500 M109A6 Paladin 155mm (all to be built within 5-9 years)
X) 500 EOD Robots (all to be built within 5 years)
XI) 500,000 Bayonets (M6, M7, and M8) (100,000 to be delivered in 2 years, 100000 to be delivered in the next 5 years, and the last 300,000 to be delivered in the next 5-6 years)
XII) 2,000,000 M-4 Carbines (all to be built within 5-10 years)
XIII) 3,000,000 M-9 Pistols (all to be built within 5 years)
XIV) 100,000 G36-C (to be built within 10 years)
XV) 6,000 MK19-3 40mm Grenade Machine Gun (all to be built within 10 years)
XVI) 200,000 M203/M203A1 Grenade Launcher (all to be built within 10 years)
XVII) 100,000 M-240B Machine Gun (50,000 to be built within 5-9 years, the rest to be built within the next 8 years)
XVIII) 30,000 M-249 Squad Automatic Weapon (SAW) (all to be built within 10 years)
XIX) 350 Apache Longbow (all to be built within 10-12 years)
XX) 700 UH-60 Black Hawks (500 to be built within 5-9 years, the other 500 within the next 10 years)
XXI) 350 CH-47 Chinook (200 to be built within 10 years, the other 150 within the next 5-9 years)
XXII) 400 OH-58 Kiowa Warrior (all to be built within 6 years)
XXIII) 1,000 AN/TWQ-1 Avengers (500 to be built within 10 years, 250 within the next 5 years, and the last 250 within the next 5 years)
XXIV) 40 MIM-104 Patriots (to be built within 10 years)
XXV) 200 FGM-148 Javelins (all to be built within 5 years)
XXVI) 150 BGM-71 TOWs (all to be built within 5 years)
XXVII) 300 M270 MLRSs (200 to be built within 10 years, the other 100 will be built within 5-9 years)
XXVIII) 30 M93 Fox Nuclear, Biological, & Chemical Reconnaissance System (15 to be built within 10 years, the other 15 within the next 10 years)
XXIX) 250 Towed Howitzer (105mm) M119A1/A2 (all to be built within 10 years)
XXX) 300 Towed Howitzer (155mm) M198 (all to be built within 10 years)
XXXI) 300 M120/M121 Mortar (all to be built within 5-8 years)
XXXII) 300 M224 Mortar (150 to be built within 5 years, the other 150 within the next 7 years)
XXXIII) 300 M252 Mortar (150 to be built within 5 years, the other 150 within the next 7 years
XXXIV) 1,500,000 Field Protective Mask, M40/M42-Series (all to be delivered within 5-7 years)
XXXV) 5,000 Chemical Agent Detector Kit, M256A1 (all to be delivered within 5 years)
XXXVI) 100,000 Joint Service Lightweight Integrated Suit Technology (JSLIST) (all to be delivered within 5-8 years)
XXXVII) 100 Heavy Equipment Recovery Combat Utility Lift & Evacuation System (HERCULES) (M88A2) (all to be built within 10 years)
XXXVIII) 4,000 M113 Family of Vehicles (2,000 to be built within 10 years, the rest within the next 10 years)
XXXIX) 8,000 Family of Medium Tactical Vehicles (FMTV) (2,000 to be built within 5-9 years, 4000 to be built within the next 10 years, and the last 2,000 to be built within 5 years)
XXXX) 900 Heavy Expanded Mobility Tactical Truck (HEMTT) (all to be built within 5-9 years)
XXXXI) 8,000 HMMWV (2000 to be built within 5-8 years, 4000 to be built within the next 10 years, and the last 2,000 to be built within th next 9 years)
XXXXII) 1,000 M1070 Heavy Equipment Transporter (HET) (400 to be built within 5 years, 400 to be built within the next 5-7 years, and the last 200 to be built within the next 2 years)
XXXXIII) 400 Palletized Load System (PLS) (200 to be built within 9 years, the other 200 within the next 10 years)

The contract is going to be given to KIC Military Ops., its affiliates, and other small defense contractors for 700 billion LOD and 45 years. To be paid in 65 years.

Proposals

Debate

These messages have been posted to debate on this bill:

subscribe to this discussion - unsubscribe

Voting

Vote Seats
yes
 

Total Seats: 89

no
 

Total Seats: 81

abstain
  

Total Seats: 30


Random fact: Cultural Protocols should generally be reflective of RP conducted within the nation and should not significantly alter or modify the ethnic, religious or linguistic composition without considerable and reasonable role-play or other justification.

Random quote: "When there's a single thief, it's robbery. When there are a thousand thieves, it's taxation. " -Vanya Cohen

This page was generated with PHP
Copyright 2004-2010 Wouter Lievens
Queries performed: 31